A hybrid electric source

Eramine’s electric system is hybrid. Part of it uses solar energy – a sustainable energy source – and the rest uses fuel. After the installation of 300-kWh solar panels in 2021 that are sustaining the basecamp and the Training Center, we estimate that fuel savings will reach 40% by 2030, which will reduce our carbon footprint.

Solar farm
Solar farm

Different actions have been implemented to ensure the energy efficiency of the site. We have invested in a power plant on site and a gas compression plant 320 km away.

The gas motor that produces the electricity and the exhaust gas are used to co-generate steam and hot water, because of the technology we have chosen.

This way, we make the best use of the energy content of the gas.

Solar panels plant

300 kWh
Capacity

6314 m2
Surface area

4320 kWh
Daily production

98%
Availability